wrapping up our cafe project…
smoothing out the textured walls in the kitchen. so. much. work.
it took about four layers to get them smooth enough. worth it so we could avoid the plastic paneling route.
back when we thought the floors were done…then they cracked.
we had to completely redo them. We like the new appearance way more, but we were still disappointed.
more coving…
more coving and patching up cracks in the floor…
Finishing up the coving and wall portion.
this is what our floors look like up close!
floors in progress…
Thanks to Garrett and Piper for saving us on this project. After our floors cracked, we we pretty overwhelmed. We reached out to Chico Chai’s Sarah Adams who connected us with Garrett for help. They were booked out eight plus weeks but still made the time to help with a couple of steps and train Rylan on the rest. The was the final morning where they applied the epoxy sealant.
Get a load of that view!
Beautiful new floors ft. our humongous freezer.
Built Noah this desk! A much comfier setup than before.
Kitchen was still a bit of a disaster here, but even then it looks a hundred times better than before.
thanks to our buddy Aidan for helping us muscle in our livelihood!
So weird seeing it empty like this. It wasn’t even this empty when we bought it!
moving everything out of the truck and inside the cafe! bittersweet.
Thanks to Erin Wade for installing the track lighting for us! She worked so hard to help us prep the gallery.
opening the cafe with a new tee design from Rami! screenprinted up by SilkShop
first pour in the new cafe!
can’t believe it’s finally ready!
our new home!